Tue, Sep 22
Third-party contractors will be on site at Bridge 145b Railway Bridge on the Shropshire Union Canal to carry out a detailed inspection of the Railway bridge.
The works will take place from 8am to 5pm on Monday 2 November 2026.
A pontoon and scaffolding will be in place during the inspection. Please approach the area with caution and be prepared to stop to allow the equipment to be moved safely. Please also follow any instructions given by the contractors on site.
We expect any delays to be no longer than 30 minutes.