Bridge 30A Longhole Viaduct ( High Speed 2 Viaduct ), near Long Itchington, Warwickshire

Navigation Restriction and Towpath ClosurePublished

Bridge 30A Longhole Viaduct ( High Speed 2 Viaduct ), near Long Itchington, Warwickshire

Grand Union Canal

Type

Navigation Restriction and Towpath Closure

Reason

3rd Party Works

Region

West Midlands

Last update

Fri, Aug 7

Timing

Mon, Sep 7 → Wed, Sep 30

Affected location

Grand Union Canal

Weired Lock 19 next to Lock 19 to Lock 18, Welsh Road Lock

Update history

Fri, Aug 7

Contractors working on behalf of HS2 need to carry out essential works on the Longhole Viaduct over the Grand Union Canal.

Following the postponement of previously advertised works, revised dates have now been confirmed.

To allow these works to take place safely, night-time closures of both the canal and towpath are required. The canal and towpath will close at 8pm and reopen at 6am the following morning.

The closures will take place on the following dates: • 8pm on 7 September 2026 until 6am on 8 September 2026 • 8pm on 8 September 2026 until 6am on 9 September 2026 • 8pm on 14 September 2026 until 6am on 15 September 2026 • 8pm on 15 September 2026 until 6am on 16 September 2026 • 8pm on 21 September 2026 until 6am on 22 September 2026 • 8pm on 22 September 2026 until 6am on 23 September 2026 • 8pm on 28 September 2026 until 6am on 29 September 2026 • 8pm on 29 September 2026 until 6am on 30 September 2026

During the above periods, the canal and towpath will remain open between 6am and 8pm each day.

Thank you for your patience and understanding while these essential works are carried out.

Conditions can change. Check local signage and the latest official notice before travelling.

View original notice