Fri, Aug 7
Our team remains on site carrying out repairs to the damaged cill at Lock 63, offside. During the repair works, further issues have been identified with the drive shaft and bearing, both of which have failed. These components are critical to the operation of the lock gate and are required to enable it to open safely.
The towpath lock will reopen for navigation once the current closure between Locks 60 and 70 has been lifted.
Further details about the navigation closure between Lock 41 & Lock 70 can be found via the following link: https://canalrivertrust.org.uk/notices/019f991a-d9a2-7d55-a21e-9eed2484596d
A further update will be provided on or before Friday 21st August.