Great Bedwyn (above Church Lock 64)

Navigation RestrictionPublished

Great Bedwyn (above Church Lock 64)

Kennet & Avon Canal

Type

Navigation Restriction

Reason

Repair

Region

Wales and South West

Last update

Wed, Jul 29

Timing

Mon, Aug 24 → Fri, Oct 16

Affected location

Kennet & Avon Canal

Lock 64, Church Lock to Bridge 97, Bedwyn Mill Road Bridge

Update history

Wed, Jul 29

Please note that there is a correction to the mooring information contained within our previous notice.

The permanent moorings at Great Bedwyn and the towpath mooring opposite the works do not need to be vacated from 17 August as previously stated.

These moorings must be kept clear from the morning of 24 August for the duration of the works.

All other information within the original notice remains unchanged.

We apologise for any confusion caused and thank you for your cooperation.

Tue, Jul 21

Soft bank protection works will be carried out on the offside of the navigation between Church Lock (64) and Bridge 97.

Narrowboats and other small craft – There will be no restriction to navigation.

Larger vessels and wide-beam craft – You may experience short delays while we temporarily move equipment to allow safe passage. Please allow extra time for your journey.

Moorings – The permanent moorings at Great Bedwyn and the towpath mooring opposite the works need to be kept clear from 17 August 2026 for the duration of the works.

Thank you in advance for your cooperation.

Conditions can change. Check local signage and the latest official notice before travelling.

View original notice