Fri, Sep 18
Following our last update the repair to the damaged offside paddle at Lock 42 is expected to be completed today.
Our team will then remove the equipment over the weekend to reopen the offside lock by 5 pm on Monday 21 September.
Navigation will remain possible through the towpath-side lock.
A further update will be provided on or before Monday, 21 September.